Rule sets
The schematron rule sets this validator runs, with the pinned version and every rule.
Which rule sets run depends on the schema of the file. EN 16931 always runs first.
Rules of your own, such as a CIUS or in-house checks? Run your own Schematron, alone or together with these rule sets.
- EN 16931 (UBL)
CEN/TC 434 · version 1.3.16 · 979 rules (281 fatal, 698 warning)
- EN 16931 (CII)
CEN/TC 434 · version 1.3.16 · 806 rules (335 fatal, 471 warning)
- Peppol BIS Billing 3.0
OpenPeppol · version 3.0.20 · 159 rules (135 fatal, 24 warning)
- KoSIT XRechnung 3.0 rules (UBL)
KoSIT · version 3.0.2 (schematron 2.6.0) · 77 rules (66 fatal, 10 warning, 1 information)
- KoSIT XRechnung 3.0 rules (CII)
KoSIT · version 3.0.2 (schematron 2.6.0) · 74 rules (61 fatal, 12 warning, 1 information)
- Factur-X / ZUGFeRD MINIMUM rules
FNFE-MPE and FeRD · version Factur-X 1.09.2 / ZUGFeRD 2.5.2 · 55 rules (55 fatal)
- Factur-X / ZUGFeRD BASIC WL rules
FNFE-MPE and FeRD · version Factur-X 1.09.2 / ZUGFeRD 2.5.2 · 278 rules (278 fatal)
- Factur-X / ZUGFeRD BASIC rules
FNFE-MPE and FeRD · version Factur-X 1.09.2 / ZUGFeRD 2.5.2 · 385 rules (384 fatal, 1 warning)
- Factur-X / ZUGFeRD EN 16931 rules
FNFE-MPE and FeRD · version Factur-X 1.09.2 / ZUGFeRD 2.5.2 · 433 rules (429 fatal, 4 warning)
- Factur-X / ZUGFeRD EXTENDED rules
FNFE-MPE and FeRD · version Factur-X 1.09.2 / ZUGFeRD 2.5.2 · 943 rules (921 fatal, 22 warning)
Validate your invoice
Drop a UBL or CII XML file. The validator detects the schema and runs its rule sets. Free, no signup.